Imperial stockpile - PP vs SP for stockpile points
Posted: Wed Sep 13, 2017 10:27 pm
I think it could help the UI and the users if we make a difference between production points and stockpile points.
PP and SP are different kind of resources even if they both can be used for production.
PP, if not used are excess and go to waste.
SP, stick around until use
E.g. instead of saying something like "The stockpile ratio of excess PP get transferred to the stockpile" you can say "The stockpile ratio is the amount of SP every excess PP yields."
Also the different unit gives some extra context which helps save screen space (see the attached screenshot; instead of writing 'Maximum Stockpile Use' i can write 'Maximum Use')
PP and SP are different kind of resources even if they both can be used for production.
PP, if not used are excess and go to waste.
SP, stick around until use
E.g. instead of saying something like "The stockpile ratio of excess PP get transferred to the stockpile" you can say "The stockpile ratio is the amount of SP every excess PP yields."
Also the different unit gives some extra context which helps save screen space (see the attached screenshot; instead of writing 'Maximum Stockpile Use' i can write 'Maximum Use')