Production Queue ordering
Posted: Sat Sep 24, 2016 10:53 pm
I am running W10, and was running 4.5 before installing FreeOrion_v0.4.6_2016-09-16.49f9123_Win32_Setup. These remarks are for 4.5. (4.6 is unusable - see my other post.)
When scheduling new production items, when I schedule a new building or ship at planet A, it should proceed independently of what is scheduled at Planets B through Z. As it runs currently at 4.5, an item scheduled at Planet A where nothing else is scheduled is scheduled to finish a few hundred turns in the future behind all the things queued for all the other planets.
I can manually move items to the front, but that delays all the stuff already scheduled at other planets.
How can building an industrial complex at Planet A be delayed by all the ships being built at planet B?
I searched the forum for this issue, but the volume of posts returned was high, and I was unable to determine if this has already been reported or discussed.
Thanks for your efforts!
O
When scheduling new production items, when I schedule a new building or ship at planet A, it should proceed independently of what is scheduled at Planets B through Z. As it runs currently at 4.5, an item scheduled at Planet A where nothing else is scheduled is scheduled to finish a few hundred turns in the future behind all the things queued for all the other planets.
I can manually move items to the front, but that delays all the stuff already scheduled at other planets.
How can building an industrial complex at Planet A be delayed by all the ships being built at planet B?
I searched the forum for this issue, but the volume of posts returned was high, and I was unable to determine if this has already been reported or discussed.
Thanks for your efforts!
O